Quantcast

Emergecy work

Ponte 25 de Abril: Emergency work for serious cracks known for 3 years

Ponte 25 de Abril: Emergency work for serious cracks known for 3 years

Researchers at the National Laboratory of Civil Engineering (LNEC) have warned the government for several months the extreme urgency and need for structural work on Ponte 25 de Abril. To live in Portugal is also to take the most emblematic bridge that connects the Lisbon and Setubal regions. Indeed, confidential documents have reached the Visão magazine and indicate the severity of the cracks on Portugal's most heavily used bridge. What does the report say about the urgency of works on Ponte 25 de Abril? What are the measures taken to avoid the worst? Bob, the Expatriate Assistant in Lisbon and Portugal tells you everything.